I stopped by the mechanic shop today, they finished the thru hull install and it looks great. Real clean job, I will get some pics when I get it back. They rebuilt the carb which was mess, handling some last adjustments now. Since the interior isn't done yet I'm going to have the out drive sandblasted and repainted.
The interior is hopefully going to be done next week, going on 3 weeks now. Apparently there is a delay in the logo's being sewn into the pieces. I'm having the Checkmate knight sewn into the back of both bolster seats, and a larger one on the engine cover. On the 2 side panels will be a small CHECKMATE. I look forward to getting it done so I can get some pics on the site.
The interior is hopefully going to be done next week, going on 3 weeks now. Apparently there is a delay in the logo's being sewn into the pieces. I'm having the Checkmate knight sewn into the back of both bolster seats, and a larger one on the engine cover. On the 2 side panels will be a small CHECKMATE. I look forward to getting it done so I can get some pics on the site.