I finally got some time to do a winter project on the Enforcer!! I'm removing the old tube gil bracket and will replace it with a setback bracket and a jackplate. While the boat is apart I'm going to gelcoat the bilge and surrounding areas or where the batteries and oil tank sit. Durning the floor and transom resto I used a non skid application, worked for the floor but for some reason it started peeling in the bilge area.
So here we go, I removed the motor and gil bracket today. Hopefully over the weekend the trim tabs and swim platform will be removed as well. This is for painting the transom later, first I'll plug all 18 holes with a dowel dipped in resin. Then glass them over on the inside and out. Then drill new holes for the setback bracket (4).Once that's done I'll need to repair some gel cracks then prime and paint. Here are some pictures from today.
So here we go, I removed the motor and gil bracket today. Hopefully over the weekend the trim tabs and swim platform will be removed as well. This is for painting the transom later, first I'll plug all 18 holes with a dowel dipped in resin. Then glass them over on the inside and out. Then drill new holes for the setback bracket (4).Once that's done I'll need to repair some gel cracks then prime and paint. Here are some pictures from today.