• Welcome to the Checkmate Community Forums forums.

    You are currently viewing our boards as a guest which gives you limited access to view most discussions, articles and access to our other FREE features.
    By joining our free community you will be able to:

    » Interact with over 10,000 Checkmate Fanatics from around the world!
    » Post topics and messages
    » Post and view photos
    » Communicate privately with other members
    » Access our extensive gallery of old Checkmate brochures located in our Media Gallery
    » Browse the various pictures in our Checkmate photo gallery

    Registration is fast, simple and absolutely free so please, join our community today!

    If you have any problems with the registration process or your account login, please contact support by clicking here or by using the"contact us" link at the bottom of the page.

New 2800SX interior!

I haven't had alot of time to work on the boat this past two weeks. I did make some progress...the V-birth forward bulkhead panel (covered in silver carbon fiber vinyl) is now installed along with the the trim (also covered in silver carbon fiber vinyl) for the mid cabin ceiling bulkhead. The V-birth pads are in place. The galley door under the sink and starboard locker door are installed. I still have to cover and install the ceiling panel that hides access to the back of the dash and the panel that hides the back of the radio above the cabin door. It's time to order my Lon-Coin flooring for the cockpit and begin building combing panels..
 

Attachments

  • 2800 v-birth pads 004.jpg
    2800 v-birth pads 004.jpg
    45.4 KB · Views: 85
  • 2800 v-birth pads 003.jpg
    2800 v-birth pads 003.jpg
    37.6 KB · Views: 83
  • 2800 v-birth pads 002.jpg
    2800 v-birth pads 002.jpg
    49.2 KB · Views: 82
Back
Top