starviper10
Active member
The floor was next, a ¾” sheet sealed on the bottom & edges before going in. That was screwed down with 2 sheets of glass between it and the stringer. Then a large sheet went on next overlapping to the hull. I put the knee braces in at the same time with glass between it and the floor & transom. They are made of 2 ¾” pieces put together just like the transom. Those were tabbed into the floor & transom on both sides as well.









